Prescott Brother’s Marine Construction drove these 10’ sheets of ESP 3.5 clay in Oriental, NC. This 250’ wall has a 5’ exposure and uses a dropped whale system with a 6x6. ESP’s universal corner, which can make a 45, 90 and 130 degree turn, was utilized on this job. The Prescott Brother’s have driven ESP 3.5, 4.1 and 8.5. Their inaugural 2.1 job is just around the corner.
Prescott Brothers, Oriental, NC Job Site Pictures

|
|